THE CGS MODULAR APPROACH

CGS MOD-BLOCS™
Built to fit. Ready to grow.

A revolutionary, efficient way to manufacture and install a gold ADR plant.

Explore the system
PREFABRICATED MODULES100% FACTORY TESTEDDESIGNED FOR EXPANSION

01 / FACTORY PREPARED

MANUFACTURE & TESTING

Prepared at the factory.
Ready for your site.

Your plant arrives in several prefabricated, prepared and 100% factory-tested CGS MOD-BLOCS™.

Each module is self-supporting and can be bolted down with minimal effort. The modular system makes future expansion simple and trouble-free.

Process modules bring the equipment for acid wash, elution, acid circulation, carbon screening, regeneration, storage and quench into a coordinated plant layout.

CGS modular equipment for acid wash, elution, acid circulation, carbon screening, carbon regeneration, storage and quench
CGS / PROCESS MODULESView full image

02 / INTEGRATED SKIDS

PUMPING · HEATING · SOLUTION HANDLING

The services you need.
Already brought together.

Pumping, heating and solution handling are brought together on prefabricated skids.

The skids either ship connected to the process MOD-BLOCS™ or can be bolted directly to the floor underneath them.

This approach organizes the process equipment into prepared assemblies, keeping the on-site installation focused on positioning and connecting the modules.

CGS prefabricated process skid with vessels, pipework and solution handling equipment
CGS / INTEGRATED PROCESS SKIDView full image

03 / SITE INSTALLATION

POSITION · BOLT · CONNECT

Less assembly.
A clear installation path.

Installation is limited to positioning and connecting the main modules.

  1. 01

    Bolt each of the main MOD-BLOCS™ to the floor.

  2. 02

    Bolt the modules’ pipework together.

  3. 03

    Run the power cable to the junction box on each unit.

The modular approach also supports future expansion as your operation grows.

CGS module assembly sequence showing the vessels and regeneration equipment being connected
CGS / MODULE ASSEMBLY SEQUENCEView full image

04 / ACCESS & COMPLETION

WALKWAYS & STAIRWAYS

Pre-fitted access.
The finishing connection.

Once the CGS MOD-BLOCS™ skids are installed, the prefabricated, pre-fitted walkways and stairways can typically be installed in a few days.

The access structures are prepared to fit the module layout, completing the plant’s walkways and stair connections.

Explore the equipment
CGS plant before and after fitting the yellow-railed walkways and stairways
CGS / WALKWAY & STAIRWAY INSTALLATIONView full image

PLAN YOUR NEXT PLANT

Start with a module.
Build toward your future.

YOUR CGS CONTACTCameron Barton
cameron.barton@cgsmining.com

START A CONVERSATION

Tell us about
your project.

Tell us what you need. Choose a contact, review your message, then send it from your email app.