All pumping, heating, and solution handling are compiled on pre-fabricated skids that either ship connected to the process Mod-Blocs™ , or can be bolted directly to the floor underneath.

Copyright © CGS Mining  |   Privacy Policy

After installing each CGS Mod-Blocs™ skid, the pre-fabricated and pre-fitted walkways and stairways can typically be installed in a few days.

Installation is limited to bolting each of the main Mod-Blocs™ to the floor, bolting their pipe together and running power cable to the junction box on each unit.

The CGS MOD-BLOCS™  system is a revolutionary and efficient way to manufacture and install a gold ADR plant. Our plant comes in several pre-fabricated, prepped and 100 % factory tested CGS Mod-Blocs™.  Each piece is self supporting and can be bolted down with minimal effort.  The system makes any future expansions simple and trouble free.